Scope of Work Completed

  • Full loft conversion project in progress.
    Removal of old insulation and flooring.
  • New timber structure and framing installed for dormer and roof support.
  • First fix electrical wiring underway.
  • Foil-backed insulation being fitted between rafters.
  • Structural steel and joist supports prepared for future
  • flooring and ceiling finish.
  • New uPVC window installed to allow natural light and ventilation.

Timber framework installed, insulation fitted, and electrical wiring in progress for loft conversion.

Loft space during structural preparation and insulation removal. Roof covering in progress.