Scope of Work Completed

  • Side and rear single-storey extension project underway.
  • Excavation of foundations to required depth and width.
  • Concrete foundation poured as per building control guidelines.
  • External brickwork constructed up to roof level.
  • Roof tiling and new window units installed on extension structure.
  • Project progressing through structural phase with utilities and internal work to follow.

Side and rear extension brickwork completed up to roofline with windows installed.

Foundation trench excavated and prepared for concrete pour.

Concrete foundations poured and leveled along the perimeter.

Corner section of concrete foundations poured, ready for blockwork.